PUMP :  OPERATION, MAINTENANCE AND TROUBLESHOOTING



Hotel Golden Flower, Bandung|21 – 24 February 2011 | Rp7.250.000/person
Hotel Golden Flower, Bandung|13 – 16 June 2011 | Rp7.250.000/person
Hotel Golden Flower, Bandung| 7 – 10 November 2011| Rp7.250.000/person










TUJUAN TRAINING :



Training yang akan diadakan mempunyai tujuan seperti yang tertera pada butir-butir berikut :




  1. Memahami prinsip kerja pompa.

  2. Memahami kelebihan dan kekurangan masing-masing jenis pompa.

  3. Memahami spesifikasi masing-masing jenis pompa.

  4. Memahami spesifikasi sistem instalasi.

  5. Memahami parameter operasi.

  6. Mampu mengevaluasi unjuk kerja pompa.

  7. Mampu menangani kelainan opersai (trouble).

  8. Memahami dan mampu melaksanakan perawatan.

  9. Mampu meramalkan unjuk kerja pompa termodifikasi



 



WHO SHOULD ATTEND




  • Process Engineers

  • Instrument Engineers

  • Material Engineers

  • Structure Engineers

  • Electrical Engineers

  • Mechanical Engineers

  • Safety and Environment Engineers





 



TRAINING MATERIAL OUTLINE



CAKUPAN MATERI TRAINING :




  1. Komponen utama pompa dan fungsinya

  2. Komponen-komponen pembantu : diffuser, packing/sealing, bearings dan balancing drum/piston

  3. Pompa sentrifugal, aliran campuran dan aksial

  4. Kecepatan spesifik

  5. Faktor faktor penentu besarnya head, kapasitas aliran dan prestasi pompa

  6. Sistem : head statik dan dinamik (head mayor dan minor)

  7. Titik kerja ( matching point) operasi

  8. Operasi tunggal, seri dan paralel

  9. Kendala-kendala operasi :

    1. kavitasi : NPSH tersedia, NPSH persyaratan

    2. tinggi hisap

    3. minimum flow

    4. water-hammer

    5. seizure (panas, gesekan, kegagalan pelumasan dll).




10. Operasi :




  1. start-up dan shut-down

  2. kegagalan operasi (trouble-shooting) : gejala, sebab dan tindakan



11. Kecepatan putar kritis
12. Instalasi pompa dan sistem
13. Perawatan : routine, terjadwal, break-down
14. Material
15. Studi kasus
16. Diskusi



 



INSTRUCTOR



Ir. Pawito Merto Sontowiro, Msc adalah alumnus Teknik Mesin ITB dan sejak tahun 1973 menjadi dosen di jurusan tersebut sampai sekarang. Beliau adalah kepala Laboratorium Energi termal Teknik Mesin Institut Teknologi Bandung, Beliau juga pernah menjabat sebagai ketua jurusan Teknik Mesin ITENAS Bandung, Pernah mengajar di SESKOAD, Pernah mengajar di prokerma depnaker-ITB, prokerma PLN-ITB. Beliau juga pernah memperdalam keilmuan di luar negeri seperti bidang Coal Energy , Argonne, Chicago, Ill., USA, bidang Combustion, Petc, Pittsburgh, Pa, USA dan Pinch Technology, Asian-Australia Energy Cooperation. Bidang spesialisasi Beliau adalah Boiler, Turbin Uap/Gas, Pompa, Kompresor, Konversi Energi dan analisis energy.. Pernah mengerjakan projek pada bidang Modifikasi Sistem Pembakaran Lokomotip D-52, Modifikasi Sistem Penunjang Boiler, Analisis Sistem Boiler, dan lain-lain. Beliau adalah trainer produktif, pernah mengajar training  untuk banyak perusahaan di Indonesia seperti Chevron Indonesia Company, Chevron pacific Indonesia, Total E&P Indonesie, PT. Pusri, PT. Pupuk Kaltim, PT. BADAK, Depnaker RI, PT. KKA Aceh, KDTP I Bontang, UP-IV PERTAMINA, Kalimantan Prima Coal (KPC), PLN, PT. PERTAMINA, DIKTI, BPPT, PT. Indonesia Power, Pertamina UP II, PT. Pupuk Kujang, PT. Petroleum Consolindo, PT. Indah Kiat Pulp and Paper, PT. Krakatau Steel, PLTU Paiton, PLTU Suralaya, PT. Kaltim Pasifik Amoniak, CNOOC  SES LTD, PLTGU  BEKASI POWER, PT. INDO FUJI ENGINEERING, PT. CONOCO PHILLIPS, dan lain-lain.  Pak Pawito juga aktif menulis buku seperti Perpindahan Kalor, Konversi Energi, Thermodinamika, Pembangkit Uap, Bahan Bakar Dan Pelumas, dan Pompa. Beliau telah melakukan banyak penelitian disertai publikasi ilmiahnya.



 



 





VENUE



Hotel Golden Flower, Bandung



 



TRAINING DURATION



4 days



 



TRAINING TIME



21 – 24 February 2011
13 – 16 June 2011
7 – 10 November 2011





 



INVESTATION PRICE/PERSON




  1. Rp 7.250.000/person (full fare)  or

  2. Rp 7.000.000/person (early bird, payment 1 week before training) or

  3. Rp 6.750.000/person (if there are 3 persons or more from the same company)



 



FACILITIES FOR PARTICIPANTS




  1. Training Module

  2. Training CD Contains Training Material

  3. Certificate

  4. Stationeries: NoteBook and Ballpoint

  5. Jacket or Waistcoat or T-Shirt

  6. Bag or Backpackers

  7. Training Photo

  8. Training Room with Full AC Facilities and multimedia

  9. Once lunch and twice coffeebreak every day of training

  10. Qualified  instructor

  11. Transportation for participants from hotel of participants to/from venue of training(if minimal number of participants from one company is 4 persons)



 



Minggu, 14 Maret 2010

Centrifugal Pumps: Selection, Operation and Maintenance

Centrifugal Pumps: Selection, Operation and Maintenance



Novotel Hotel, Bandung | May 17-21, 2010 | Rp. 8.250.000,-






OBJECTIVE



  • Refresh the knowledge of the participants on fluid mechanic and pump characteristics

  • Understand centrifugal-pump basic-system design, selection, operation, treatment and installation

  • Learn the critical symptoms of pump operation

  • Enhance the knowledge on pump sealing and rolling elements

  • Gain additional knowledge on inspection and maintenance of centrifugal pumps

  • Knowledge sharing among the participants and instructors


INTRODUCTION



Assuming that a plant is a body of human being, pumps are the "heart" of the body. Those play very important and vital roles to flow the "blood" of a plant. In every plant or production operation system, we find pumps. However, unlike bolts and nuts, neither industry nor production-operation management will put pumps in stock. It is NOT cost effective and is very uncommon practice to put a complete set of pump in the warehouse stock due to financial reasons.



Therefore, properly specifying, selecting, installing, operating and maintaining pumps are very significant and are very important steps to have "trouble free" during the entire life of the plant operation. Thus, proper maintenance and operation is also the key to reduce the entire cost of the plant and production operation system.



This five-day training will provide a comprehensive knowledge and understanding of pump selection, installation, operation, and maintenance program. The training will concentrate in centrifugal pump as they are the most common one used in the industries and day life.



FUTURING THE FOLLOWING SUBJECT



Basic Theory of Fluid Mechanics




  • Physical properties of incompressible fluid

  • Static fluid

  • Basic flow of incompressible fluid

  • Basic fluid dynamic

  • Basic fluid energy process



Basic Theory of Centrifugal Pump and Installation




  • Head or energy requirement of the installation

  • The principle of energy transfer in centrifugal pump

  • Characteristic of pump and its installation (Capacity, Head, and Efficiency)

  • Combination of pump and installation

  • Pump specification

  • Pump selection based on capacity, head, and efficiency

  • Pump arrangement; series and parallel

  • Suction analysis (Cavitations and NPSH)



Basic Theory of Reciprocating Pump and Installation




  • Type of reciprocating pumps

  • Comparison of centrifugal and reciprocating pumps.

  • Discharge of a reciprocating pump.

  • Slip of the pump.

  • Power required driving a reciprocating pump.

  • Indicator diagram of a reciprocating pump.

  • Variation of pressure in the suction and delivery pipes due to acceleration of the piston.

  • Effect of the acceleration of the piston on the indicator diagram.

  • Maximum speed of the rotating crank.

  • Effect of friction in the suction and delivery pipes, on the indicator diagram.

  • Effect of fitting air vessels on the suction and delivery pipes of a reciprocating pump.

  • Maximum speed of rotating crank with air vessels.

  • Work done against friction with/without and air vessels.

  • Flow of water into and from the air vessel, fitted to the delivery pipe of a reciprocating pump.

  • Multiple cylinder pumps.



Critical Symptoms of Pump Operation




  • Cavitations

  • Water hammer

  • Over pressure

  • Negative pressure

  • Surging

  • Pressure fluctuation



Operation




  • Procedure to run and stop the pump

  • Controlling the capacity

  • Hazard prevention

  • Automatic operation

  • Centrifugal pump application

  • General notes on pre-starting checks

  • General notes on pump lubrication

  • General notes on pump operation

  • General notes on pump maintenance

  • Process pump bearing



Centrifugal Pump Sealing




  • Seals principles and practice

  • Pump shaft sealing

  • Mechanical seals in the process industry



Rolling Element Bearings in Centrifugal Pump




  • Principles of centrifugal pumps

  • Angular contact ball bearing in centrifugal pump

  • Double row angular contact ball bearing



Selecting Multiphase Pumps



Inspection and Maintenance of Pump




  • Preliminary inspection

  • Operating condition inspection

  • Spare parts handling

  • Inspection (visual, dimensional and non-destructive test)

  • Mechanical and electrical run-out

  • Dynamic balancing per API-610

  • Rotor assembly

  • Trouble shooting



Practice of centrifugal pump performance measurement at Fluid Lab. Mechanical Engineering ITB



WHO SHOULD ATTEND



  • Fresh Mechanical or Rotating Engineers, Engineering and Construction Engineers, Project Engineer

  • Production Operators, Technicians, Asset Management Team members, Maintenance and Operation Personnel who are responsible for the

  • Selection, Sizing, Specifying, Installation, Testing, And Maintenance Of pumping system.

  • Experienced professionals who want to refresh or broaden their understanding of pumps

  • Professionals with little to moderate production facility design and or production operation back ground

  • Other professionals who want better understanding of the subject



 



Instructor
Ir. I Nengah Diasta M.Eng
Ir. I Nengah Diasta M.Eng. is a lecturer in Mechanical Engineering Department of Bandung Institute of Technology for more than 10 years. His expertise is on the area of fluid mechanics and pumping system. He also gives training program to the public such as Pertamina, PT. Pupuk Kaltim, PT. Telkom and some other PSC companies on this subject. On the practical aspects, Mr. Diasta was project leader in the industries such as PT. Telkom, Containers Terminal of Tanjung Priok, Juanda Airport, and Rekayasa-Sumitomo Power Plant Project at Wayang Windu Geothermal field, Bandung.



Schedule
May 17-21, 2010
5 days



Venue
Novotel Hotel, Bandung



Tuition Fee
Rp.8.250.000,- per participant, excluding accommodation & tax.