Jumat, 28 Januari 2011

OIL & GAS: MEASUREMENT AND CALCULATION

OIL & GAS: MEASUREMENT AND CALCULATION



Hotel Banana Inn Bandung | 9 – 12 May 2011 | Rp 7.250.000/person
Hotel Banana Inn Bandung |24 – 27 October 2011 | Rp 7.250.000/person






INTRODUCTION AND OBJECTIVE



This training presents the principles, design, and applications of flow measurement systems, emphasizing flowmeter accuracy, performance, sizing, and specification, selection, and installation practices with objectives as follows :




  • To design a system to make practical and precise industrial flow measurements

  • To Calculate the effects of fluid properties on flow meter performance

  • To Evaluate flow meter performance statements and compare them with application requirements

  • To Specify and select the appropriate flow meters for different applications

  • To Identify requirements for flow meter calibration

  • To Solve typical flow meter problems

  • To Perform flow meter compensation and totalization calculations

  • To Understand flow and related phenomena (piping hydraulics, Reynolds Number, cavitation, etc.)

  • To Size flow elements for specific applications



 



TRAINING MATERIAL OUTLINE




  • Introduction to Flow Measurement

  • Flow meter Selection

  • Flow meter Performance

  • Linearization and Compensation

  • Totalization : Differential Pressure Flow meters

  • Orifice Plate Flow meters

    • Installations

    • Sizing and calculation

    • Accuracy and rangeability

    • Types and selection

    • Performance



  • V-cone Flow meters

  • Venturi tube Flow meters : Velocity Flow meters

  • Turbine Flow meters

    • Operation theory

    • Installation

    • Design and construction

    • Accuracy

    • Sizing and selection



  • Ultrasonic Flow meters

    • Operation theory

    • The Doppler effect

    • The transit time

    • Design variations

    • Application and performance



  • Magnetic Flow meters

    • Operation theory

    • Installation

    • Excitation

    • Tubes and liners

    • Electrodes

    • Selection and sizing



  • Vortex Flow meters

    • Operation theory

    • Installation

    • Sizing and accuracy

    • Limitations

    • Mass Flow meters



  • Coriolis Mass Flow meters

    • Operation theory

    • Installation

    • Sizing and accuracy

    • Limitations



  • Thermal Flow meters

  • Positive Displacement Flow meters:

    • Helical Gear

    • Oval Gear

    • Piston and Other Technologies



  • Discussion and cases study





 



INSTRUCTOR



Ir. Sudiharto, MT,  is alumnus from Bandung Institute of Technology (ITB) department of petroleum engineering. Ir. Sudiharto besides as instructor and researcher at Geothermal Laboratory ITB, he is also being as Production Engineer at LAPI ITB, Production & Reservoir Analist and  expert board (Dewan Pakar) at Forum Komunikasi Daerah Penghasil Migas, and joining in Community Development Team Dirjen Migas since 2003.



Some projects have been handled by him such as policy analysis expert on oil and gas subsector, oil and gas production expert, and field economicity such as: projection study investation potency energy and mineral resources, implementation study national energy consumtion, study on field use of Brownfield in Indonesia, inventarization research of old well potential in regency of Muaro Jambi,  blueprint arrangement manpower on oil and gas subsector, development operation cost estimation system oil and gas: geological and geophysical stage, study of combustion flare gas at PERTAMINA DOH Jawa Bagian Barat, survey and development of GIS based datas for planning and distribution BBM  and transportation gas through pipe, study on planning of Indonesia – Asean pipeline system, etc. Ir. Sudiharto have trained for training class for many companies in Indonesia. Some topics that have been frequently delivered by him as follows :




  1. Electric Submercible Pump, Problem and Trouble Shooting Mecanism

  2. Crude Oil Analysis

  3. Drilling, Production and Workover Strategy

  4. Well Workover and Completion Stretegy

  5. Petroleum Finance, Acconting and Reservoir Management

  6. Plan of Development in Oil and Gas Industries

  7. Pressure Control for Drilling Engineer

  8. Plan of Development (POD) & Authorization For Expenditures (AFE)

  9. Management Skills Secretary Petroleum Gas and Oil Industries

  10. Pressure Transient Analysis and Well Testing Data Interpretation

  11. Oil Production System and Operation

  12. Formation Damaged and Well Stimulation

  13. Simulasi Reservoir for Petroleum Engineer

  14. Oil and gas transportation/measurement, etc



 



VENUE



Hotel Banana Inn Bandung



 



TRAINING DURATION



4 days



 



TRAINING TIME




  1. 9 – 12 May 2011

  2. 24 – 27 October 2011



 



INVESTATION PRICE/ PERSON




  1. Rp 7.250.000/person (full fare)  or

  2. Rp 7.000.000/person (early bird, 1 week  payment before training ) or

  3. Rp 6.750.000/person (if there are 3 persons or more from the same company)






FACILITIES FOR PARTICIPANTS




  1. Training Module

  2. Training CD Contains Training Material

  3. Certificate

  4. Stationeries: NoteBook and Ballpoint

  5. Jacket or Waistcoat or T-Shirt

  6. Bag or Backpackers

  7. Training Photo

  8. Training Room with Full AC Facilities and multimedia

  9. Once lunch and twice coffeebreak every day of training

  10. Qualified  instructor

  11. Transportation for participants from hotel of participants to/from venue of training(if minimal number of participants from one company is 4 persons)






 




Tidak ada komentar:

Posting Komentar